Rest area 15.04 m²
Terrace 5.70 m²
Bedrooms A + B 14.72 m²
Total area 41.70 m²
Floors
Timber frame construction C24, embedded OSB
Thermal insulation – eco-wathed
9 mm wind barrier layer “Cembrit Windstopper”
Walls
Vertical external cladding with fine-sawn surface
Diffusion membrane
Timber frame construction C24
Thermal insulation – eco-wathed
Vapor barrier membrane
Gypsum board for walls
Gypsum board for walls (WC)
Roof construction
Roofing Classic (standard colors and coatings)
Drainage systems (standard paint and coating)
Timber frame construction C24
Diffusion membrane
Vapor barrier membrane
Thermal insulation
For plasterboard or paneled ceilings
Windows and doors
PVC windows and exterior doors with 3 panes, white, without ventilation
Window and door installation materials, including external metal window sills
Electrical installation
Cables installed (in corrugated pipes) to sockets and lights
Junction box for automatic switches
Heat insulation
200 mm floor insulation
100 mm partition insulation
250 mm roof insulation
Heating
Stiebel Eltron electric convectors
Water and sewerage
Built-in water supply
for the outlet of water supply and sewerage to the foundation of the house.
Delivery and transportation
Loading of construction structures at the factory
Transport (delivery) to the construction site
Personnel transport costs
Crane with operator
Turnkey house
Interior finishing materials
“Stiebel Eltron” electric convectors
Paints for walls and ceilings
Floors: laminate or parquet, linoleum or tiles in the toilet
Skirting adapted to laminate
Interior doors
Wooden stairs (if there is a second floor)
External lighting